The BarrierPartialTA function calculates the theoretical price, sensitivities, the implied volatility, the implied strike, and the implied correlation value of a European partial-time two-asset barrier option using Bermin’s model. This function evaluates up-and-in, down-and-in, up-and-out, and down-and-out barrier options for both calls and puts. See Barrier Options for a further explanation.

 

 

BarrierPartialTA

(OptionType, BarrierType, ModelStatistic, Asset1, Asset2, Strike, Barrier, TimeBarrier, TimeExpire, Volatility1, Volatility2, InterestRate, YieldRate1, YieldRate2, Correlation, MarketPrice, Monitoring, TimeFormat, InterestType, YieldRate1Type, YieldRate2Type)

Note: Optional arguments are shown in Italics. MarketPrice is not Optional for the Implied Calculations.

 

 

Argument

Description

OptionType

Alphanumeric value indicating the type of option:

Call = 1 or "c" (case insensitive)

Put = 2 or "p" (case insensitive)

BarrierType

Alphanumeric value indicating the barrier type:

Down_Out = 1 or "do" (Down and Out Barrier)

Down_In = 2 or "di" (Down and In Barrier)

Up_Out = 3 or "uo" (Up and Out Barrier)

Up_In = 4 or "ui" (Up and In Barrier)

ModelStatistic

Numeric value indicating the type of function required for the return value:

Theoretical = 1

Theta = 4

Rho = 7

StrikeSensitivity = 11

ImpliedStrike = 13

Delta1 = 30

Delta2 = 31

Gamma1 = 32

Gamma2 = 33

ImpliedVol1 = 34

ImpliedVol2 = 35

Vega1 = 36

Vega2 = 37

Psi1 = 38

Psi2 = 39

Lambda1 = 42

Lambda2 = 43

Chi = 48

ImpliedCorr = 50

Asset1

The price of the underlying asset one. Must be > 0.

Asset2

The price of the underlying asset two. Must be > 0.

Strike

The price at which the asset can be purchased if the option is a call or sold if the option is a put. Must be > 0.

Barrier

The barrier price level.

TimeBarrier

The expressed in either Days or Years (depending on the TimeFormat value) until the expiration of the barrier’s monitoring period. Must be 0 < TimeBarrier < TimeExpire.

TimeExpire

Time, expressed in either Days or Years (depending on the TimeFormat value), until the options expiration. Must be > 0.

Volatility1

Annualized volatility of the asset one. Must be > 0.

Volatility2

Annualized volatility of the asset two. Must be > 0.

InterestRate

Risk-free interest rate expressed as a percentage. This rate is interpreted as a continuously compounded rate unless otherwise specified in the InterestType argument.

Must be > 0.

YieldRate1

Yield, expressed as a percentage (dividends or interest yield), of the first underlying asset price. This rate is interpreted as a continuously compounded rate unless specified otherwise in the YieldRate1Type argument.

YieldRate2

Yield, expressed as a percentage (dividends or interest yield), of the second underlying asset price. This rate is interpreted as a continuously compounded rate unless specified otherwise in the YieldRate2Type argument.

Correlation

The correlation between the first underlying asset price and the second underlying asset price.

Must be -1 < Correlation < 1.

MarketPrice

Optional. The selling price of the option in the marketplace. This input is required when implied volatility and strike are calculated. Price must be > 0.

Monitoring

Optional. Alphanumeric value indicating the frequency of the barrier monitoring. If omitted, a ContinuousSample is used.

TimeFormat

Optional. Alphanumeric value indicating the format of the time arguments (i.e. TimeExpire). If omitted, Days are used as the default. Specified as either:

Days = 0 or "D" (case insensitive)

Years = 1 or "Y" (case insensitive)

InterestType

Optional. Alphanumeric value indicating the type of InterestRate to use when evaluating the option. This value is converted to Continuously Compounded for the calculations. If omitted, a Continuously Compounded rate is used.

YieldRate1Type1

Optional. Alphanumeric value indicating the type of YieldRate1 to use when evaluating the option. This value is converted to Continuously Compounded for the calculations. If omitted, a Continuously Compounded rate is used.

YieldType2

Optional. Alphanumeric value indicating the type of YieldRate2 to use when evaluating the option. This value is converted to Continuously Compounded for the calculations. If omitted, a Continuously Compounded rate is used.

 

 

Example

Calculate all of functions for a down-and-in partial-time two-asset call where the option is 90 days from expiration, the first asset price is $60, the second asset price is $55, the exercise price is $50, the barrier is $51, the time of the barrier is 75 days, the risk-free interest rate is 5% per annum, yield rate of the first and second assets are both 2.5% per annum, the correlation is 0.5, and the annual volatility of both assets is 20%. The barrier monitoring and all of the rates are continuous. So,

Input

 

Output

Variable

Value

 

Function

Name

Value

OptionType

Call

 

1

Theoretical:

3.254197

BarrierType

1 (Down-and-In)

 

4

Theta:

-0.027369

Asset1:

60

 

7

Rho:

-0.026465

Asset2:

55

 

11

Strike Sensitivity:

-0.371857

Strike:

50

 

13

Implied Strike:

50.690582

Barrier:

51

 

30

Delta Asset 1:

0.364117

TimeBarrier:

75

 

31

Delta Asset 2:

-1.119644

TimeExpire

90

 

32

Gamma 1:

-0.051131

Volatility1:

20%

 

33

Gamma 2:

0.237041

Volatility2:

20%

 

34

Implied Volatility 1:

0.435357

InterestRate

5%

 

35

Implied Volatility 2:

0.190012

YieldRate1:

2.5%

 

36

Vega Volatility 1:

-0.031207

YieldRate2:

2.5%

 

37

Vega Volatility 2:

0.248759

Correlation:

0.5

 

38

Psi Yield 1:

-0.053869

MarketPrice:

3

 

39

Psi Yield 2:

0.072311

TimeFormat

Years

 

32

Lambda 1:

6.713492

 

 

 

42

Lambda 2:

-18.92339

 

 

 

48

Chi:

-1.749828

 

 

 

50

Implied Correlation:

0.645232

 

 

See Also

Single Barrier

Single Barrier Trinomial

Double Barrier

Lookback Barrier

Partial Start Barrier

Partial End Barrier

Soft Barrier

Two Asset Barrier